Friday, October 22, 2021
اُردُو نیوز Newspaper Live-TV(UK) Live-TV(PK)
اُردُو نیوز Newspaper
Live-TV(UK) Live-TV(PK)

Nandipur power project shuts amid lack of oil

Nandipur power project shuts amid lack of oil
September 8, 2015
NANDIPUR (92 News) – The Nandipur Power Project has been closed due to lack of oil on Tuesday. As per details, the Nandipur project was not delivering as per the plan due to lack of oil but the project had to shutdown due to lack of oil. The power project was inaugurated by the prime minister Nawaz Sharif.
تازہ ترین خبریں حاصل کرنے کے لیے فوری اطلاع کی اجازت دیں

آپ کسی بھی وقت دائیں طرف نیچے بیل آئیکن پر صرف ایک کلک کے ذریعے آسانی سے سبسکرائب کر سکتے ہیں۔